Leo Constra Developments — home renovation contractors in Toronto and the GTA
Bathroom Renovation
Transform your bathroom into a modern retreat with premium fixtures and finishes.
Kitchen Renovation
Create your dream kitchen with custom cabinetry, countertops and layouts.
Home Renovation
Full-scale home transformations from concept to completion.
Condo Renovation
Maximize your condo space with smart design and expert craftsmanship.
Basement Renovation
Unlock your basement's potential with functional, beautiful living spaces.
Garden Suite Builder
Detached backyard suites & ARUs for rental income or multigenerational living.
Flooring
Premium hardwood, tile and luxury vinyl flooring installation.
Expert renovation services across the Greater Toronto AreaGet a free consultation
Back to Blog
Bathroom RenovationsBy Daniel R.

Bathroom Renovation Cost in Burlington: 2026 Price Guide

Burlington bathroom renovations run $15,000 to $30,000 for a full reno in 2026. The house matters as much as the finishes — a Roseland classic and an Alton Village two-storey price out differently.

What a Bathroom Renovation Costs in Burlington in 2026

Plan on $15,000–$30,000 for a full bathroom renovation in Burlington as of 2026. Most standard full-scope projects — demolition, new waterproofing, porcelain tile, new tub or shower, vanity, toilet, lighting — come in between $16,000 and $24,000. Per square foot, GTA bathrooms run $250–$450.

By room type:

  • Powder room: $6,000–$12,000
  • Standard 3-piece family bathroom: $15,000–$30,000
  • Primary ensuite: $28,000–$45,000 typical; $35,000–$75,000+ with a walk-in shower, freestanding tub, and double vanity
  • Accessible/aging-in-place bathroom: $20,000–$40,000

Anything quoted under $15,000 is a cosmetic refresh — fixtures and paint, not a gut renovation — and it pays to know which one you are comparing. Quotes in Ontario also usually exclude 13% HST, so confirm before you sign. For the complete line-item picture that applies across the GTA, see our bathroom renovation cost guide.

Price Tiers: Refresh, Full Renovation, and Luxury Rebuilds

The $8,000–$15,000 refresh keeps your existing layout and the waterproofing behind the walls. New vanity, toilet, and lighting, a tub refit or acrylic surround, fresh paint. It works when the last renovation was done properly and recently. It fails when it is used to dress up a 30-year-old bathroom whose membrane is already compromised.

The $15,000–$30,000 full renovation strips the room to the studs and rebuilds it: new waterproofing, new tile, new everything. This is where most Burlington projects belong, especially in homes that still have their original builder bathroom.

Above $30,000, the room itself changes. Walls move, showers grow, tubs become freestanding. Popular add-ons at this tier: heated floors at $1,500–$3,000 — genuinely worth considering given how cold tile gets in a Burlington January; our take on whether heated bathroom floors are worth it runs the numbers — plus frameless glass at $2,000–$4,000 and natural stone at $40+ per square foot installed. South Burlington ensuites in Roseland and along the lake regularly reach $50,000–$70,000 when layout changes and premium fixtures stack up.

How Local Housing Stock Changes the Number

Burlington's housing spans a full century, and the era of your house shapes the quote.

Aldershot, the downtown core, and Roseland carry the oldest stock — pre-war through the 1950s and 60s, including lakefront character homes. Behind their plaster we routinely find galvanized supply pipe and, in the oldest houses, knob-and-tube wiring. Finishes installed before roughly 1990 can contain asbestos, so we test before demolition; lab work runs $300–$800.

The post-war bungalow and split-level belts through central and east Burlington include streets built 1965–1976 — the aluminum wiring window. The insurer-accepted fix is copper pigtailing under an ESA permit, best done while the bathroom walls are already open.

Headon Forest, Millcroft, and Brant Hills date to the 1980s–90s, which puts the earlier homes inside the Poly-B era (1978–1995). If we open a wall and find grey plastic supply lines, replacing the exposed runs during the renovation is cheap insurance.

The Orchard and Alton Village are 2000s and newer — no hazmat story, just builder-grade fixtures ready for an upgrade. Those are the most predictable bathrooms in the city to price.

Tile, Vanities, and Glass: Where the Budget Actually Goes

Labour takes roughly a third of the budget. Of the material spend, tile does the most work — visually and financially. Standard porcelain installs at $10–$25 per square foot, large-format and stone from $40, and a full bathroom tiling package typically runs $2,500–$8,000. Behind that tile sits the item we refuse to cheap out on: the waterproofing membrane. How a shower actually gets waterproofed is the least glamorous and most important part of the entire project.

The other big lines, at mid-range: vanity and countertop $1,500–$3,500; shower or tub package supplied and installed $2,500–$5,000; plumbing rough-in and connections $3,000–$5,000; electrical and lighting $1,500–$3,000. Frameless glass adds $2,000–$4,000.

Trades set the floor under all of it — GTA plumbers bill $110–$200 per hour, electricians $95–$150, tile setters $80–$125. That is why two bathrooms with identical fixtures can be thousands apart: one kept the layout, the other moved a drain.

Permits, Plumbing Changes, and Other Cost Multipliers

Like-for-like bathroom work in Burlington — same fixtures in the same places, new tile, paint — needs no building permit. Moving or adding plumbing, changing structure, or creating a new bathroom does. Burlington's 2026 fee schedule sets the minimum permit fee at $377, with residential interior alterations charged at $8.25 per square metre, and council approved a roughly 5% increase effective April 1, 2026 — so treat those as floor numbers. The city also offers an optional Fast Track review at a 50% premium (minimum $1,000) if schedule matters more than fees.

Electrical is separate from the building permit everywhere in Ontario: your electrician files an ESA notification, typically $90–$300, usually folded into their quote.

The multipliers that move Burlington bathroom budgets most: relocating a toilet, tub drain, or shower valve adds $2,000–$6,000; broader layout changes add $2,000–$5,000; and hazmat discovered mid-demolition in a pre-1990 home is the classic budget-buster, which is exactly what the contingency is for.

Planning a Realistic Bathroom Budget in Burlington

Pick the tier honestly. If your Alton Village ensuite is nine years old and just dated, the refresh tier may be enough. If your Roseland or Aldershot bathroom is original to the house, budget for the full renovation and carry a 15–20% contingency; for newer homes, 10% is usually sufficient.

Refresh versus renovate comes down to the waterproofing: if you do not know its condition, or the grout stays dark days after a shower, stop putting money on top of it.

Sequence the project properly — design and material orders first, demolition only once tile and vanity are in hand, permit in place before any plumbing moves. A standard bathroom then takes 2–3 weeks of construction; ensuites with layout changes take 3–5.

We have renovated bathrooms across Burlington and the GTA since 2004, licensed and insured, with a 2-year workmanship warranty on everything we build. Details are on our Burlington bathroom renovation page — or request a free quote and we will give you a number built on your actual house.

Ready to start your renovation?

Our team is here to help you bring your vision to life. Get a free, no-obligation quote today.

Get Free Quote

Explore Our Services

Frequently Asked Questions

Clear answers to the questions Ontario homeowners ask most.

A full bathroom renovation in Burlington costs $15,000–$30,000 as of 2026, with most standard projects landing $16,000–$24,000. Powder rooms run $6,000–$12,000, primary ensuites $28,000–$45,000, and luxury rebuilds with layout changes reach $50,000–$75,000+. Most quotes exclude 13% HST, so confirm before comparing bids.

Not for like-for-like replacements — new fixtures in the same locations, tile, and paint are exempt. A permit is required when you move or add plumbing, alter structure, or add a new bathroom. Burlington's minimum permit fee is $377 under the 2026 schedule, with interior alterations at $8.25 per square metre, and electrical work needs a separate ESA notification.

At $1,500–$3,000 installed, electric heated floors are one of the cheaper comfort upgrades — but only during a renovation, when the floor is already open. Adding them later means redoing the tile. They make the most sense in principal bathrooms used daily and on cold slab-adjacent floors; less so in rarely used guest bathrooms.

Pre-1990 homes in Aldershot, downtown, and Roseland can surface asbestos-containing finishes (testing $300–$800), galvanized or knob-and-tube-era services, and 1965–1976 streets may have aluminum wiring needing ESA-permitted pigtailing. Early Headon Forest and Millcroft homes fall in the Poly-B piping window. Budget a 15–20% contingency on older houses.

Contact Us

Licensed & insured contractors delivering residential and commercial projects, including renovations, additions, and custom builds across the GTA.

Have a dream project?

Trust our expert contractors at Leo Constra to make it happen—exactly how you envision it.

Get Free Quote