Leo Constra Developments — home renovation contractors in Toronto and the GTA
Bathroom Renovation
Transform your bathroom into a modern retreat with premium fixtures and finishes.
Kitchen Renovation
Create your dream kitchen with custom cabinetry, countertops and layouts.
Home Renovation
Full-scale home transformations from concept to completion.
Condo Renovation
Maximize your condo space with smart design and expert craftsmanship.
Basement Renovation
Unlock your basement's potential with functional, beautiful living spaces.
Garden Suite Builder
Detached backyard suites & ARUs for rental income or multigenerational living.
Flooring
Premium hardwood, tile and luxury vinyl flooring installation.
Expert renovation services across the Greater Toronto AreaGet a free consultation
Back to Blog
Condo RenovationsBy Daniel R.

Condo Renovation Cost in North York: 2026 Guide

From a $15,000 flooring-and-paint refresh to a $120,000 full-unit renovation, here is what North York condo projects actually cost in 2026 — and how building age moves the number.

What Condo Renovations Cost in North York

As of 2026, a single-area refresh in a North York condo — flooring throughout, fresh paint, maybe a new backsplash — typically starts around $15,000 to $18,000. A full renovation of a 700 sq ft one-bedroom lands between $70,000 and $120,000. Larger corner suites along the Yonge corridor with custom millwork and layout changes push past $150,000. Most contractor quotes exclude 13% HST, so confirm before you compare.

Condo work costs more than the identical scope in a freehold house, and almost all of the premium is logistics rather than materials. Board approval takes 4 to 10 weeks before anyone swings a hammer. Service elevators book at $200 to $500 per day. Work hours run Monday to Friday, roughly 9 to 5, which stretches schedules 20 to 30 percent. Hard flooring needs an acoustic underlay the board will actually approve.

Our Toronto condo renovation cost guide covers the citywide numbers in detail. Below is what changes when the address is North York.

Yonge-Sheppard Towers vs Older Don Mills Stock

North York condos split into two very different renovation projects. The glass towers clustered around Yonge and Sheppard and up toward Finch are mostly recent builds with builder-grade finishes. Nothing is broken; it is just thin. Laminate counters, flat-pack vanities, pot lights on one switch. Renovating here is upgrading, not remediating — flooring, a proper kitchen, built-in storage — and budgets stay predictable because there are few surprises behind the drywall.

The older buildings around Don Mills, Sheppard East, and the side streets off Yonge are a different animal. Suites are noticeably bigger — 1970s and 1980s two-bedrooms often out-measure new three-bedroom layouts — which means more floor to cover and more wall to paint, but also space genuinely worth investing in. Anything finished before about 1990 can carry asbestos in drywall compound and textured ceilings, so we test before disturbing. Popcorn ceilings are near-universal in that era; removal runs $2 to $6 per sq ft, more with a full skim coat and repaint. Buildings from 1965 to 1976 also fall inside the aluminum-wiring era, which matters the moment new circuits get added.

Two buildings a block apart can produce quotes $30,000 apart for the same wish list. Building age is the reason.

Board Approval Packages That Pass First Review

Effectively every North York condo corporation requires written approval before renovation work starts, and the review takes 4 to 10 weeks. Packages get bounced for missing paperwork far more often than for the scope itself. A first-review pass usually needs:

  • A detailed scope of work with drawings, not a one-paragraph description
  • The contractor's insurance certificate — boards commonly require $2M to $5M in commercial general liability with the corporation named as additional insured
  • WSIB clearance for the contractor
  • A construction schedule with start and end dates
  • A refundable damage deposit, typically $1,000 to $5,000, held by management

Know what the board will never approve before you design around it. Plumbing stacks, exterior walls, windows, and anything structural are common elements — what you cannot change in a condo renovation covers the hard limits. We prepare alteration packages as part of every condo project, because a clean first submission is the cheapest schedule insurance there is.

Scope Budgets: Kitchen, Bath, Full Refresh

Working numbers for 2026, based on what full-scope professional renovations cost across the GTA. A condo kitchen starts around $25,000, and roughly $32,000 is a common allocation inside a full-unit budget — cabinets, quartz counters, backsplash, appliances, and the electrical behind them. A condo bathroom runs $15,000 to $30,000 for full demo, waterproofing, tile, and new fixtures in the same layout. Moving plumbing in a condo is sometimes physically impossible and always needs board sign-off, so same-layout designs keep both the cost and the approval risk down.

A flooring-and-paint refresh across a one-bedroom starts around $15,000 once you include acoustic underlay, which adds $2 to $4 per sq ft in material before the flooring itself. Full-unit renovations — kitchen, bathroom, flooring, paint, lighting, doors and trim — cluster between $70,000 and $120,000, with roughly $7,000 to $8,000 of that going to project management, permits, board approval costs, and elevator fees rather than anything you can touch.

Kitec Alert for 1995-2007 Buildings

If your building went up between 1995 and 2007, check for Kitec plumbing before you plan anything. Kitec is a PEX-AL-PEX pipe with brass fittings — usually orange for hot lines, blue for cold — and it was common in GTA condos of that window. It was subject to a $125M class-action settlement, but claims are closed; remediation is now out-of-pocket. Insurers ask about it, and some buildings have already mandated replacement.

Look under the kitchen sink and behind the laundry connections for the orange and blue lines and stamped fittings, or ask property management — most affected corporations already know. The renovation angle is simple: if you are opening a kitchen or bathroom anyway, replacing Kitec while the walls are open costs far less than a standalone repipe later. We flag it during quoting in every mid-1990s to mid-2000s building, because finding it mid-project is exactly the kind of surprise that eats a contingency.

Booking Elevators, Managing Logistics, and Next Steps

Elevator access shapes the whole schedule. Service elevator bookings run $200 to $500 per day, and across a full renovation, material handling and elevator costs can total $3,000 to $8,000. Every delivery — cabinets, stone, flooring — needs its own booking, and demolition debris goes down the same way materials came up. How elevator booking and working hours affect condo renovations walks through the details. Add corridor protection, a ban on wet-cutting inside the building, and the 9-to-5 weekday window, and a job that takes three weeks in a Willowdale house takes four in the tower across the street.

Here is the decision path. In a newer Yonge corridor tower, a focused scope — flooring, kitchen, storage — buys the most improvement per dollar. In an older Don Mills-area building, budget for testing and possible remediation, and treat the larger footprint as the asset it is. Either way, start with your building's alteration paperwork, then price the scope. We handle condo renovations across Toronto with approvals included — request a free quote and bring your floor plan.

Ready to start your renovation?

Our team is here to help you bring your vision to life. Get a free, no-obligation quote today.

Get Free Quote

Explore Our Services

Frequently Asked Questions

Clear answers to the questions Ontario homeowners ask most.

As of 2026, a single-area refresh such as flooring and paint starts around $15,000 to $18,000. A full renovation of a typical 700 sq ft one-bedroom runs $70,000 to $120,000, and luxury renovations of larger suites exceed $150,000. Quotes usually exclude 13% HST. Building age, board requirements, and elevator logistics all move the final number.

Yes. Effectively every Toronto condo corporation requires written approval before work starts, and review typically takes 4 to 10 weeks. Expect to submit scope drawings, a schedule, your contractor's insurance certificate naming the corporation as additional insured, and WSIB clearance. Many buildings also hold a refundable damage deposit of $1,000 to $5,000.

Kitec is a pipe system with brass fittings, typically orange and blue lines, installed widely between 1995 and 2007 — including in many GTA condos. It was subject to a class-action settlement, but claims are closed, so replacement is now out-of-pocket. Check under sinks for the coloured lines or ask property management. Replacing it during a renovation is far cheaper than a standalone repipe.

North York falls under Toronto Building, so rules and fees match the rest of the city. Cosmetic work — paint, flooring, cabinet swaps — needs no building permit. Moving plumbing, altering walls, or changing ductwork does, with Toronto's minimum permit fee at $214.79 as of 2026. Electrical work always requires a separate ESA notification, usually filed by your electrician.

Plan for approvals plus construction. Board review runs 4 to 10 weeks before any work starts. Construction then takes roughly 20 to 30 percent longer than the same scope in a house because of weekday-only work hours and elevator bookings — a bathroom lands around three to four weeks on site, and a full unit roughly two to three months.

Contact Us

Licensed & insured contractors delivering residential and commercial projects, including renovations, additions, and custom builds across the GTA.

Have a dream project?

Trust our expert contractors at Leo Constra to make it happen—exactly how you envision it.

Get Free Quote