
Whole-home renovations in Burlington run $150–$400 per square foot in 2026 — but an Aldershot character home and a Millcroft two-storey need very different budgets. We break it down by street era.
Burlington Renovation Pricing in 2026: The Real Ranges
A standard whole-home renovation in Burlington costs $150–$400 per square foot in 2026 — new kitchen, updated bathrooms, flooring throughout, paint, lighting, and modest layout changes. A cosmetic multi-room refresh (paint, flooring, fixtures, nothing structural) lands around $60–$150 per square foot. A full gut with structural work, rewiring, and replumbing starts near $400 per square foot and reaches $450–$550+ once design fees, permits, and HST are counted. On a typical 2,000 sq ft two-storey, full renovations commonly total $300,000–$800,000; focused multi-room projects start around $50,000.
Two things before you anchor on a number. Most contractor quotes exclude 13% HST — always confirm. And in Burlington, the street you live on matters more than the square footage, because build era decides how much budget goes into things you will never see. That is why the rest of this guide is organized by neighbourhood age. For the full tier breakdown, see what home renovations cost across the GTA.
Aldershot, Roseland and Downtown: Budgeting the Older Homes
Burlington's oldest stock sits in Aldershot, the downtown core, and Roseland — pre-war homes through 1950s–60s builds, including the lakefront character houses that make these streets desirable. They also carry the classic old-home issue stack.
Knob-and-tube wiring was standard in Ontario homes built up to the late 1940s, and insurers now routinely refuse or cancel coverage where it is still live. Selective remediation runs $5,000–$15,000; a substantial rewire of a typical house is $15,000–$35,000, plus drywall patching afterward. Galvanized supply plumbing — standard before about 1960 — is another common find, with repipes running $2,000–$15,000 depending on size and access. And anything built before roughly 1990 may contain asbestos in plaster, drywall compound, or flooring: lab testing costs $300–$800, and certified abatement typically lands $3,000–$12,000. None of this shows up in an inspiration-board budget, which is why older Burlington homes should plan for the upper half of every range.
Lakefront exposure adds its own wear. Freeze-thaw cycles off the water are hard on older brick and original windows, so envelope repairs often ride along with interior work in Roseland and Aldershot. Price them together where you can — scaffolding, disruption, and trade mobilization paid once instead of twice.
The 1960s–70s Bungalow and Split Belts: Two Checks First
Central and east Burlington filled in through the 1950s–70s with bungalows and side-splits. If your street went up between 1965 and 1976, check for aluminum branch wiring before pricing anything — it was used extensively in Canadian homes during that window. Aluminum is not illegal and does not force a rewire: the fix insurers accept is copper pigtailing under an ESA permit with a Certificate of Acceptance. Left unaddressed, it can add roughly $1,200–$2,400 a year to insurance premiums, which is real money over a decade of ownership.
The second check is the ceiling. Textured and popcorn ceilings are near-universal in this era, and pre-1990 texture should be presumed to contain asbestos until a test says otherwise. Straight removal runs $2–$6 per square foot; with a full skim coat, prime, and paint it can reach $10. We build both checks into the first site visit on any Burlington home from these decades — finding them at demo is the expensive version.
Headon Forest to The Orchard: What Newer Homes Actually Need
Headon Forest, Millcroft, and Brant Hills are mostly 1980s–90s; The Orchard is late 1990s–2000s and Alton Village newer still. Hazmat is largely a non-issue here, so budgets go where you can see them — kitchens, bathrooms, flooring, basements — instead of into remediation.
Two quiet checks remain. Homes from the 1978–1995 window can carry grey Poly-B supply piping, and 1995–2007 builds fall in the Kitec era — orange and blue piping with brass fittings, and with the class-action settlement closed, remediation is now out of pocket. Both are a quick visual check at the water heater and manifold. Beyond that, plan by room: kitchens typically run $25,000–$80,000, full bathrooms $15,000–$30,000, and sequencing the trades properly saves rework — here is the right order for a whole-home renovation. Basement finishing is the other big line in these newer areas: basic finishes run $35–$55 per square foot in the GTA, more once a bathroom or wet bar enters the scope.
Burlington Permits: $377 Minimum, $8.25/m² and Fast Track
Burlington's permit fees are set under Building Permit By-law 30-2026. The minimum permit fee is $377, and residential interior alterations are charged at $8.25 per square metre of work area — with a roughly 5.35% fee increase taking effect April 1, 2026, so treat posted figures as floors. Burlington also offers an optional Fast Track service at 50% of the permit fee on top (minimum $1,000, maximum $10,000 for low-rise residential) when schedule matters more than fees.
Permits are triggered by structural changes, wall removals, plumbing alterations, additions, and new units — not by paint, flooring, or cabinet swaps. Electrical work is separate: it needs an ESA notification filed by a licensed electrical contractor, typically $90–$300 and usually built into the electrician's quote. Ontario's legislated first review is 10 business days for houses once an application is complete, but real-world timelines run longer. Budget for at least one resubmission cycle, or hand the drawings and application to your contractor — we do this on every permit-triggering Burlington project.
Building Your Number: A Sample Whole-Home Budget
Here is how a standard-tier renovation of a 2,200 sq ft Burlington two-storey typically breaks down in 2026:
- Kitchen (semi-custom cabinets, quartz, mid-range appliances): $35,000–$60,000
- Two full bathrooms: $30,000–$55,000
- Hardwood through main areas at $8–$15/sq ft installed: $12,000–$25,000
- Interior painting at $1.80–$4.50/sq ft of wall area: $6,000–$15,000
- Electrical, plumbing, drywall, trim, and permits: $20,000–$45,000
- Contingency at 10–20%: plan it, don't hope
One scheduling note from experience: humid Ontario summers and dry furnace-season winters mean new hardwood needs acclimatization and stable indoor humidity, so we install flooring after drywall and paint have fully dried — sequencing that protects the largest visible investment in the house.
If your home is 1980s or newer, the low end of each line is realistic. If you are in Aldershot or a 1960s split belt, weight toward the high end and get the wiring and hazmat questions answered before committing — here is how to set a renovation budget with the right contingency. When you are ready for real numbers on your actual house, our home renovation team in Burlington will walk the property and give you a free, line-item quote — call (416) 995-7855 or use our contact form. We have renovated GTA homes since 2004 and back the work with a 2-year workmanship warranty.
Ready to start your renovation?
Our team is here to help you bring your vision to life. Get a free, no-obligation quote today.
Get Free QuoteFrequently Asked Questions
Clear answers to the questions Ontario homeowners ask most.




